Checklist · Mexico

Mexico supplier qualification checklist

Updated All guides

Short answer

A Mexico supplier qualification checklist has four stages: desk checks on the public record, documents requested from the plant, independent confirmation of those documents, and a visit or audit. Do them in that order and write the date and source beside every check.

Key facts

Stages
Public record, documents, confirmation, visit
Public record
DENUE, edition 2026-05-20, with IMMEX, PROSEC and RETC entries
Needs the supplier's RFC
Every SAT list
Cost of stage 1
Search is free. The full record needs Pro

Stage 1: the public record, from your desk

  1. Write down the part and the processDrawing number, material, volume, destination, and the activity code (SCIAN) the process maps to.
  2. Find the plant in DENUESearch its name in the Mexico search. Record the address, the activity code, the staff band and the edition date. See the DENUE guide.
  3. Read the IMMEX and PROSEC entriesOn the record, note the programme number, its type and its status, and whether the postal code also matched. Record the edition date. See the IMMEX guide.
  4. Read the emissions register entryA RETC entry means the plant reported regulated substances for 2024. Record the establishment number, the NRA.
  5. Note Testigo's own checksWhere the plant publishes a website or an email: whether the website responded, which certificates the site names, and whether the email domain accepts mail. Each has a date.

Entries are attached by exact company name only. A plant with no IMMEX entry may work under another company's programme. Write "no entry found", not "does not export".

Stage 2: documents to request

  • The legal name as registered, and the RFC.
  • A recent Constancia de Situación Fiscal.
  • The ISO 9001 or IATF 16949 certificate, if your customer requires one.
  • Two or three customer references you can call.
  • The equipment list for your process, and capacity against your volume.
  • PPAP or first-article capability data for a comparable part.
  • For US imports: who the producer is, the origin of key inputs, and whether it will provide a certification of origin. See the USMCA guide.

Stage 3: confirm independently

  • Compare the name and RFC on the Constancia with the quote, the purchase order and the invoice.
  • Search the SAT lists with the RFC: Article 69-B first, then the Article 69 lists. Record the status, the publication dates and the file date. See the 69-B guide.
  • Confirm each certificate with the body that issued it, or in IAF CertSEARCH. A certificate named on a plant's website is a claim until you do.
  • Call the references. Ask what went wrong and how it was fixed.
  • If the legal name has no IMMEX entry, ask which entity holds the programme.

Stage 4: the visit or audit

  • Capacity: the machines, presses or lines your part needs, and the shifts they run.
  • Quality: inspection equipment, records, and how nonconforming parts are contained.
  • Traceability: from raw material lot to shipped part.
  • Tooling: who owns it, where it sits, how it is maintained.
  • People and conditions: safety, staffing and working conditions.

Who does each stage

StageOn TestigoYours to do
1. Public recordYes. DENUE with IMMEX, PROSEC and RETC entries, each with its editionRecord what you found and the date
2. DocumentsNoRequest them from the plant
3. ConfirmationNo. Tax standing and certificates are never checkedSAT lists by RFC, certificates with the issuer, references
4. VisitNo. Testigo has not visited the plantsVisit or commission an audit

With Pro you can save plants to a list, add a note to each and export the list as CSV. That gives you one dated line per plant for stage 1. The limits are on what Testigo checks, and the counts by country are on the coverage page.

Record it

For every line above, write what you checked, where, on what date, and what you could not check. A record that names its gaps can be defended in the meeting.

The longer method, with the limits of each source, is in how to verify a supplier in Mexico.

Frequently asked questions

What should a supplier qualification checklist include?

It should cover four stages: checks on the public record (the plant, its export programme, its emissions register entry), documents from the supplier (legal name, RFC, certificates, references), independent confirmation of those documents, and a visit or audit for capacity, quality and traceability. Record the date and source of every check.

How do I qualify a new supplier in Mexico?

Start with the public record from your desk. Then ask the plant for its RFC, its Constancia de Situación Fiscal, its certificates and references. Confirm each document independently, including the SAT lists by RFC, and visit only the plants that pass. A registry check narrows the list. It does not approve a supplier.

What is the difference between qualifying and approving a supplier?

Qualifying establishes that a supplier is on the public record, what programmes it holds, that its RFC is clear of the SAT lists and that it holds the certificates it claims. Approving is the customer's decision that it can make a specific part to specification, usually through a process such as PPAP.

Can I do stage 1 without an account?

Partly. Without an account the search shows the count and a short preview. An account is free and starts with 14 days of Pro, with no card. Pro opens every result and the full record: address, coordinates, the contacts INEGI publishes and the official-list entries. It also adds lists with notes and CSV export.